UTILITY ROUTE
SURVEYS
Transmission line route surveys are continually performed by GCT. Our firm has been
contracted repeatedly to provide route surveys using conventional survey methods and
aerial photogrammetry with GPS for ground control. The work involves establishing
long-distance geodetic control, profiles and cross-sections, alignment for construction,
right-of-way acquisition, legal descriptions/sketches and boundary surveys for required
easements and condemnation.
Utility route projects and Easement surveys have been completed for Alabama Electric
Cooperative, Eglin Air Force Base, Okaloosa Gas, Okaloosa County, FL, and Gulf Power
Company.
Power Transmission Line surveys for
Alabama Electric Cooperative (AEC), alone, have totaled over 375 miles.
Sample Planview portion of Bonifay to Defuniak Springs Transmission Line
Some of the
Transmission Line Route surveys for AEC include:
Bonifay to
Defuniak Springs Florida - 30 miles
McIntosh to
Benndale, Alabama - 27 miles
Dublin to
Fuller, Alabama - 18.0 miles
East
Calloway Jct. to Wewahitchka, Florida - 21 miles
Auburn Jct.
to to Auburn, Florida - 12 miles
Black Creek
to Santa Rosa, Florida - 8 miles
Freeport to
Bluewater Bay, Florida - 7 miles
Gainer to
Liberty, Alabama - 12 miles
Sample Profile portion of Bonifay to Defuniak Springs Transmission Line
|